The OZEV chargepoint grant has changed again
This page sets out who still qualifies, how the grant amount has moved, and what the scheme's final year means for a decision you're making now.
See the dated updates feedWhat the increase changes, and what it leaves alone
A grant scheme has several settings, and the amount paid per socket is only one of them. Raising that figure changes the sum paid out; it says nothing on its own about who can apply, what the installation has to look like, or when the scheme is due to close.
Eligibility doesn't move with the rate
The households and landlords a grant scheme is written for stay the same group whether the per-socket payment goes up or stays where it was. A property that didn't qualify before a rate rise doesn't start qualifying afterwards, and a property that did qualify doesn't need to re-check its basic eligibility just because the figure has changed.
The conditions on the installation stay as they were
Conditions written into a grant, such as the earthing requirement on a cross-pavement installation, sit outside the rate entirely. An installer still has to meet them regardless of what the grant now pays, because they were written to protect the supply. If a cross-pavement run is part of your situation, the earthing arrangement involved is worth understanding before a quote lands on the table.
An end date closes the scheme
A finish date on a grant tells you when the current scheme stops taking applications. It doesn't change the amount paid, the eligibility rules, or the conditions attached to an installation in the meantime, and those apply in full right up until the date the scheme ends. Checking the updates page before you apply is the way to see whether any of those figures have moved since you last looked.
What OZEV's final-year label means for your decision
When a government body labels a scheme's year as its final one, it is saying something specific: funding has been allocated for that period and no further allocation has been confirmed beyond it. It is not a guess about what might happen next, and it is not the same as a scheme simply running out of money unannounced. It is a stated limit.
Why the label changes how you should treat the grant
A grant with an open-ended future and a grant in its final year carry different weight in a decision. With the final-year label, there is no assurance that a successor scheme will follow, at the same rate, at a lower rate, or at all. A household weighing up the cost of a charge point installation against the grant on offer is weighing against a figure that has a confirmed cut-off.
What this does not mean
It does not mean the grant becomes less available during its final year, and it does not mean applications are processed differently. The eligibility rules and the amount per socket apply in exactly the same way for the whole of the period OZEV has set, right up to the point the scheme closes.
What it does mean is that a household deciding now has a clearer basis for that decision than a household deciding under an open-ended scheme would. You can check whether you fall within the eligible groups and work the grant into the cost of your installation knowing the terms will not shift under you for reasons unconnected to the scheme itself.